Consultants Invited to Develop Master Plan for Hyderabad's River Musi Front Project

The Telangana State government has invited consultants to develop a comprehensive master plan for the River Musi Front Development project in Hyderabad, aiming to transform a 110-square-kilometer area along the 55-kilometer river stretch, addressing environmental and infrastructure concerns through sustainable development measures. The project's master plan will focus on clean water flow, flood mitigation, and infrastructure improvements, with consultants responsible for integrating sustainable development measures, conducting site surveys, and proposing improvements to enable clean water flow into the river. This description highlights the primary topic (River Musi Front Development project), main entities (Telangana State government, consultants), context (Hyderabad, River Musi), significant actions (developing a comprehensive master plan), and objective details (project's focus areas, consultants' responsibilities) that will guide the AI in creating an accurate visual representation of the article's content.

author-image
Aqsa Younas Rana
New Update
Consultants Invited to Develop Master Plan for Hyderabad's River Musi Front Project

Consultants Invited to Develop Master Plan for Hyderabad's River Musi Front Project

The Telangana State government has invited consultants to prepare a comprehensive master plan for the River Musi Front Development project in Hyderabad. The project covers an area of 110 square kilometers along the 55 km stretch of the River Musi, including a 1 km influence zone on either side.

Why this matters: This project has the potential to transform the riverfront area in Hyderabad, addressing key environmental and infrastructure concerns that affect the daily lives of citizens. A well-planned development project can also serve as a model for sustainable urban development in other cities, highlighting the importance of integrating environmental considerations into urban planning.

The master plan will be divided into four key components: the Blue-Green Master Plan, Land Use Master Plan, Infrastructure Master Plan, and Financial Master Plan. The Blue-Green Master Plan will focus on technology solutions for clean and recycled water flow in the river, bioengineering techniques for river bank stabilization, and natural flood plain processes to mitigate flooding.

The Land Use Master Plan will prepare a base map highlighting built-up features, existing road networks, water bodies, streams, hillocks, and forests within the site. The Infrastructure Master Plan will prepare a design basis report for all roads, bridges, and utility services. The Financial Master Plan will develop a financial feasibility model considering costs for development, project structuring, and other parameters.

The selected consultants will be responsible for conducting an analysis of existing climatic conditions and flora of the region, integrating sustainable development measures such as integrated water management, rainwater harvesting, and use of renewable energy. They will also assess prior site surveys, validate project boundaries and demarcation, carry out geotechnical investigations and sub-surface explorations for proposed bridges or highway structures, and propose improvements to enable the flow of clean and recycled water into River Musi.

The consultants will prepare a detailed master plan with geo-referenced cadastral maps for the identified land area. Applications submitted by consultants are likely to be opened on May 18, 2024. The Musi River Front Development Corporation had invited consultants last month to prepare the aggregate master plan for the project.

The River Musi Front Development project aims to transform the riverfront area in Hyderabad, covering a significant stretch of 110 square kilometers. With the preparation of a comprehensive master plan by selected consultants, the project is set to address key aspects such as clean water flow, flood mitigation, sustainable development, and infrastructure improvements along the River Musi.

Key Takeaways

  • Telangana State government invites consultants for Musi River Front Development project.
  • Project covers 110 sq km area along 55 km River Musi stretch with 1 km influence zone.
  • Master plan will have 4 components: Blue-Green, Land Use, Infrastructure, and Financial.
  • Consultants will focus on sustainable development, clean water flow, and flood mitigation.
  • Applications will be opened on May 18, 2024, for the comprehensive master plan.